Storage on the board
← the whole boardDRAFTEDFROM ANNOUNCED PROJECTS
Storage across the country
64.4 GW is on the board: 10.5 GW testing, 18.5 GW under construction, 15.2 GW permitted, 20.2 GW announced.
Every storage project, biggest first
All 480 projects are listed below.
- Sunstone SolarOregonPermitted1.2 GWDecember 2027
- Deschutes Solar and BESSOregonPermitted1.0 GWNovember 2029
- Libra SolarNevadaUnder construction700 MWDecember 2027
- Clear Fork Creek Solar and BESS SLFTexasUnder construction600 MWMarch 2027
- Maricopa SolarArizonaUnder construction550 MWSeptember 2026
- Bellefield 2 Solar & Energy Storage FarmCaliforniaTesting500 MWDecember 2026
- Grace Energy CenterCaliforniaPermitted500 MWOctober 2027
- Hecate Energy Ramsey StorageTexasAnnounced500 MWDecember 2027
- Hop Hill Solar Generation and BESSWashingtonPermitted500 MWSeptember 2031
- La Salle ESSTexasAnnounced500 MWJuly 2029
- Sunscape Renewable EnergyTexasAnnounced500 MWOctober 2028
- Dutchman Solar generation and BESSWyomingPermitted499 MWJune 2029
- Snowflake A Solar and BESSArizonaPermitted475 MWAugust 2027
- Quantum BESSTexasTesting422 MWNovember 2026
- Quantum II BESSTexasTesting422 MWNovember 2026
- Tehuacana Creek SolarTexasTesting418 MWDecember 2026
- Callisto II Energy CenterTexasTesting400 MWNovember 2026
- CO Bar Solar and BESSArizonaAnnounced400 MWDecember 2027
- Cowboy Solar IWyomingAnnounced400 MWDecember 2028
- Eagle Eye Solar and StorageArizonaPermitted400 MWMay 2028
- GabrielCaliforniaUnder construction400 MWApril 2027
- Iron BeltTexasAnnounced400 MWJune 2027
- Lycan Solar ProjectCaliforniaAnnounced400 MWApril 2030
- MariciCaliforniaUnder construction400 MWJune 2027
- Pepper Hammock Solar and StorageGeorgiaPermitted400 MWSeptember 2029
- Purple Sage Energy CenterNevadaAnnounced400 MWNovember 2028
- Valley Farms Energy CenterArizonaUnder construction400 MWDecember 2027
- CO Bar D Solar and BESSArizonaAnnounced394 MWMay 2028
- Arida Solar (Hybrid)NevadaAnnounced370 MWJune 2029
- Arkansas Cypress Solar StationArkansasAnnounced350 MWJanuary 2029
- Rowdy Creek Solar and BESSTexasPermitted350 MWMay 2027
- Cuchillas PV and BESSTexasPermitted307 MWDecember 2028
- Ash Creek BESSTexasAnnounced306 MWMarch 2028
- Darden I SolarCaliforniaUnder construction304 MWMarch 2028
- Darden II SolarCaliforniaUnder construction304 MWMarch 2028
- Darden III SolarCaliforniaUnder construction304 MWMarch 2028
- Darden IV SolarCaliforniaUnder construction304 MWMarch 2028
- Banita Creek- Spindlepop SolarTexasPermitted303 MWApril 2027
- Desert Sand BESSArizonaPermitted300 MWDecember 2028
- Easley SolarCaliforniaUnder construction300 MWMarch 2028
- Elio Energy LLCTexasAnnounced300 MWDecember 2027
- Humidor Storage ICaliforniaAnnounced300 MWSeptember 2029
- Lower Snake Solar Generation BESSWashingtonPermitted300 MWOctober 2029
- O'Bannion Energy StorageTexasUnder construction300 MWDecember 2028
- Pinopolis BESSSouth CarolinaAnnounced300 MWSeptember 2027
- Pioneer Clean Energy CenterArizonaUnder construction300 MWApril 2027
- Red Antelope Solar & Energy Storage FarmArizonaAnnounced300 MWMay 2028
- Red Butte Solar and StorageUtahPermitted300 MWApril 2029
- Red EgretTexasUnder construction300 MWOctober 2027
- Red Hollow Renewable EnergyTexasAnnounced300 MWOctober 2027
- Roadhouse Energy CenterCaliforniaPermitted300 MWDecember 2027
- Robinson SolarNevadaAnnounced300 MWDecember 2029
- Sherco BESSMinnesotaUnder construction300 MWDecember 2027
- Sherco BESSMinnesotaUnder construction300 MWNovember 2027
- Southern Bighorn Solar HybridNevadaAnnounced300 MWJuly 2028
- Sunrose Renewable EnergyTexasAnnounced300 MWDecember 2027
- THREE SISTERS Solar Generation and BESSArizonaPermitted300 MWApril 2029
- Vitex StorageNevadaPermitted300 MWJune 2028
- Elevate MiddletownConnecticutAnnounced275 MWDecember 2027
- Hashknife Energy Center LLCArizonaTesting275 MWSeptember 2026
- Royal SlopeWashingtonUnder construction260 MWOctober 2027
- Hecate Grid East Valley StorageTexasAnnounced255 MWDecember 2027
- Athens Solar I (Hybrid)CaliforniaAnnounced250 MWJune 2028
- Dry Land Prairie Energy StorageColoradoUnder construction250 MWDecember 2026
- Energizar BESSMassachusettsPermitted250 MWSeptember 2027
- Evlou Solar, LLCTexasUnder construction250 MWJanuary 2028
- Lazy U ESS 1TexasAnnounced250 MWJuly 2030
- Lazy U ESS 2TexasAnnounced250 MWJuly 2029
- Mallard Energy StorageTexasUnder construction250 MWOctober 2026
- Mystic Springs Renewable Energy (Hybrid)TexasAnnounced250 MWMarch 2028
- Rock N' RollTexasPermitted250 MWOctober 2027
- Sawtooth SolarArizonaPermitted250 MWJune 2028
- South Platte StorageColoradoUnder construction250 MWJune 2027
- Steel River Solar Phase 1ArkansasUnder construction250 MWAugust 2028
- Steel River Solar Phase 2ArkansasUnder construction250 MWJuly 2029
- Steel River Solar Phase 3ArkansasUnder construction250 MWJuly 2030
- ZeyaTexasUnder construction250 MWSeptember 2026
- Salmonfly Solar and StorageOregonPermitted247 MWFebruary 2029
- Pelicans Jaw Hybrid SolarCaliforniaTesting239 MWApril 2027
- Duffy BESSTexasTesting236 MWDecember 2026
- Adelite Storage Project LLCTexasUnder construction230 MWMarch 2028
- Ventures BESSTexasPermitted227 MWSeptember 2028
- Bramble Energy CenterTexasAnnounced225 MWApril 2029
- Romero Energy CenterArizonaUnder construction225 MWJune 2027
- Romero Energy Center II, LLCArizonaUnder construction225 MWJune 2028
- NISA Electric Generation ProjectNew YorkUnder construction220 MWOctober 2028
- Amador BESSTexasTesting220 MWApril 2027
- Coke BESSTexasAnnounced220 MWApril 2028
- Trenton Channel Energy CenterMichiganTesting220 MWDecember 2026
- Zeus BESSCaliforniaAnnounced214 MWSeptember 2031
- Atlas VIIIArizonaTesting210 MWDecember 2026
- Sanborn Hybrid 3CaliforniaUnder construction210 MWDecember 2026
- Mule Shoe Energy StorageTexasUnder construction207 MWAugust 2028
- CO Bar C Solar and BESSArizonaAnnounced206 MWAugust 2027
- Champaign BESS, LLCTexasAnnounced203 MWJune 2027
- Dios BESS, LLCTexasAnnounced202 MWMarch 2027
- Bell Creek BESS LLCTexasAnnounced201 MWNovember 2028
- Kahla StorageTexasPermitted201 MWDecember 2028
- Resaca Oasis StorageTexasUnder construction201 MWSeptember 2027
- Blackcat BESSTexasAnnounced201 MWApril 2028
- Staccato BESSTexasUnder construction201 MWApril 2027
- Alamo City ESSTexasAnnounced200 MWJuly 2027
- Alina Energy LLCTexasAnnounced200 MWJune 2028
- Anthelope Hills Solar Generation BESSMontanaPermitted200 MWDecember 2027
- Apache Hill Energy CenterTexasTesting200 MWNovember 2026
- Avant Prairie ESSTexasAnnounced200 MWJuly 2029
- Barton Branch IATexasUnder construction200 MWNovember 2026
- Bee Branch IATexasUnder construction200 MWJune 2027
- BhaluTexasPermitted200 MWDecember 2027
- Bravo ESSTexasAnnounced200 MWJuly 2029
- CastorTexasUnder construction200 MWSeptember 2026
- Centralia Battery Energy Storage SystemWashingtonPermitted200 MWDecember 2028
- Cowboy Solar IIWyomingAnnounced200 MWDecember 2027
- Crawfish Creek Energy StorageAlabamaUnder construction200 MWJune 2029
- Cumbia Energy CenterTexasAnnounced200 MWSeptember 2027
- Cypress Harvest Solar StationLouisianaAnnounced200 MWSeptember 2029
- Dega Solar and StorageAlabamaPermitted200 MWDecember 2029
- Eldora Energy LLCTexasAnnounced200 MWJuly 2028
- FlintOhioUnder construction200 MWJuly 2027
- Greenwater BESSWashingtonTesting200 MWDecember 2026
- Hashknife Energy Center II LLCArizonaTesting200 MWMarch 2027
- Hornet Solar II (TX) (Hybrid)TexasPermitted200 MWMarch 2028
- Jones City 2 SolarTexasUnder construction200 MWMarch 2027
- Juniper Creek StorageCaliforniaUnder construction200 MWMarch 2028
- Mendoza Trail BESSTexasTesting200 MWSeptember 2026
- Metro BESSTexasAnnounced200 MWDecember 2030
- Morel Energy StorageColoradoUnder construction200 MWDecember 2030
- Morrow Lake BESSTexasAnnounced200 MWDecember 2029
- Oakley BESSTexasAnnounced200 MWDecember 2030
- OCI HillsboroTexasAnnounced200 MWDecember 2027
- Padua 3TexasTesting200 MWOctober 2026
- Pine Forest Solar ITexasUnder construction200 MWAugust 2027
- Pintail BESSTexasTesting200 MWSeptember 2026
- Prost ESSTexasAnnounced200 MWJuly 2029
- Rexford 2 Solar FarmCaliforniaAnnounced200 MWDecember 2028
- Rock Rose Energy StorageTexasUnder construction200 MWMarch 2027
- Rush ESSTexasAnnounced200 MWDecember 2031
- Scopus SolarMissouriAnnounced200 MWDecember 2027
- SE Athos II, LLCCaliforniaUnder construction200 MWJanuary 2027
- Sienna Solar FarmCaliforniaAnnounced200 MWDecember 2028
- Solstice Solar LLCOklahomaAnnounced200 MWDecember 2029
- Sun Angel ESSTexasAnnounced200 MWJuly 2028
- SunShiner ESSTexasAnnounced200 MWJuly 2029
- Taft BESSMassachusettsTesting200 MWFebruary 2027
- Tex-Bar ESSTexasAnnounced200 MWJuly 2029
- Tidwell Prairie IITexasTesting200 MWOctober 2026
- Tualatin Battery Energy Storage SystemOregonPermitted200 MWDecember 2027
- Vertus Energy Storage PlantTexasUnder construction200 MWSeptember 2026
- Vichy SolarMissouriAnnounced200 MWDecember 2027
- Willow Creek Energy StorageOklahomaUnder construction200 MWDecember 2026
- Spindle BESSColoradoTesting199 MWDecember 2026
- Fremont SolarUtahUnder construction198 MWDecember 2027
- Bonanza Solar and Storage ProjectNevadaPermitted195 MWDecember 2027
- Steelhead Energy StorageTexasPermitted194 MWSeptember 2027
- Harryoung PV and BESSTexasPermitted190 MWMay 2028
- Key Energy StorageCaliforniaUnder construction190 MWApril 2027
- Serrano BESSTexasAnnounced186 MWApril 2028
- Zephyr StorageTexasAnnounced186 MWMarch 2028
- Arroyo StorageTexasTesting180 MWNovember 2026
- Brazos River BESS LLCTexasAnnounced180 MWNovember 2028
- Dawn Break SolarWisconsinPermitted180 MWSeptember 2029
- Indigo Solar & StorageTexasAnnounced180 MWMay 2027
- Starr Solar RanchTexasPermitted180 MWDecember 2031
- Brotherton StorageTexasPermitted176 MWDecember 2027
- Mcmurtre StorageTexasPermitted176 MWDecember 2027
- Willis StorageTexasPermitted176 MWSeptember 2027
- Yooperlite StorageTexasPermitted176 MWDecember 2027
- Atlas VIIIArizonaTesting172 MWJanuary 2027
- Country Acres Clean Power LLCCaliforniaTesting172 MWDecember 2026
- Coneflower Storage Project LLCTexasPermitted171 MWSeptember 2027
- AGATE BESSWashingtonPermitted170 MWFebruary 2029
- Salt Cod BESSMassachusettsPermitted168 MWDecember 2028
- Allen 2 BESSNorth CarolinaAnnounced167 MWJuly 2027
- Palo Duro Energy Storage IITexasAnnounced166 MWMay 2029
- Concho Pearl Solar and StorageTexasUnder construction162 MWOctober 2027
- Dry Creek Energy Storage, LLCCaliforniaUnder construction160 MWNovember 2027
- Vidal Energy CenterCaliforniaTesting160 MWDecember 2026
- Pecan BESSTexasPermitted157 MWDecember 2028
- Chimney Rock BESSTexasAnnounced156 MWApril 2028
- NY2 BatteryNew YorkPermitted152 MWJuly 2028
- AgaveArizonaTesting150 MWOctober 2026
- Atlas BESS IV LLCArizonaTesting150 MWMarch 2027
- Bellefield 3 Solar and Battery StorageCaliforniaAnnounced150 MWMay 2030
- Bocanova Energy Storage IITexasTesting150 MWSeptember 2026
- Boxcar Energy StorageTexasTesting150 MWMay 2027
- Corazon Energy StorageNew MexicoUnder construction150 MWSeptember 2027
- Crowned Heron 2 - Storage, LLCTexasTesting150 MWOctober 2026
- Desert BloomArizonaTesting150 MWSeptember 2026
- Faraday Energy StorageUtahUnder construction150 MWSeptember 2026
- Fortress 1ColoradoPermitted150 MWMarch 2028
- Gale 1 SolarUtahAnnounced150 MWAugust 2030
- Gunnar Reliability ProjectTexasUnder construction150 MWDecember 2026
- Mammoth Plains Energy StorageOklahomaAnnounced150 MWNovember 2027
- Meadow Springs Renewable Energy (Hybrid)IllinoisAnnounced150 MWJune 2028
- Overnight SolarCaliforniaTesting150 MWJanuary 2027
- Palo Duro Energy StorageTexasAnnounced150 MWNovember 2027
- Parks Valley Energy LLCWest VirginiaAnnounced150 MWDecember 2027
- Santa Teresa SolarNew MexicoTesting150 MWSeptember 2026
- Selma Energy CenterArizonaUnder construction150 MWDecember 2027
- Sierra Luna Energy StorageArizonaAnnounced150 MWDecember 2030
- Carousel Energy Storage, LLCColoradoUnder construction150 MWDecember 2027
- Chisme Solar and StorageTexasUnder construction146 MWMay 2027
- Okolona SolarMississippiUnder construction145 MWAugust 2028
- Summerhill BESSTexasAnnounced143 MWDecember 2028
- Vial BESSTexasPermitted141 MWSeptember 2027
- Emmons-Logan Energy StorageNorth DakotaTesting140 MWDecember 2026
- Blue Lake BESSMinnesotaUnder construction136 MWMay 2027
- Hecate Grid Gwent Storage 1CaliforniaAnnounced135 MWDecember 2028
- Stonewall BESSTexasAnnounced135 MWDecember 2029
- Boulder Solar III LLCNevadaAnnounced128 MWJune 2027
- Roccasecca BESS LLCNevadaTesting127 MWFebruary 2027
- Dolomite StorageTexasPermitted126 MWJuly 2028
- Biglow Solar Generation and BESSOregonPermitted125 MWDecember 2027
- E W BrownKentuckyTesting125 MWMay 2027
- Houston County BESSTexasAnnounced125 MWApril 2029
- OctansTexasUnder construction125 MWDecember 2028
- Midway BESSCaliforniaUnder construction125 MWJune 2027
- Lupinus Solar 2, LLCTexasAnnounced123 MWDecember 2027
- Backbone Creek BESSTexasTesting121 MWDecember 2026
- Wildcat Ranch Energy StorageTexasAnnounced120 MWNovember 2027
- Marcos PV and BESSTexasPermitted116 MWAugust 2029
- Hayrick BESSTexasPermitted114 MWMarch 2028
- Aratina Solar Center 2CaliforniaTesting113 MWDecember 2026
- Anode (Springville) BESSCaliforniaTesting113 MWDecember 2026
- Anode (Springville) BESSCaliforniaTesting113 MWDecember 2026
- CherryCaliforniaUnder construction110 MWJuly 2027
- Gatsby Energy Storage ProjectTexasUnder construction103 MWMarch 2027
- SE Athos II, LLCCaliforniaUnder construction102 MWJanuary 2027
- SGT Hoskins Solar Project HybridTexasAnnounced102 MWDecember 2027
- Dolce BESS, LLCTexasAnnounced101 MWApril 2028
- Mammoth Plains Energy Storage IIOklahomaAnnounced101 MWMay 2029
- Sandford Solar and StorageTexasPermitted101 MWDecember 2028
- Hermes Storage BESSTexasTesting100 MWOctober 2026
- Aramis I Solar ProjectCaliforniaUnder construction100 MWSeptember 2026
- Buena Vista Energy Center IIINew MexicoUnder construction100 MWDecember 2026
- Crimson Orchard Solar and BESSIdahoPermitted100 MWApril 2027
- Dahlia EnergyTexasAnnounced100 MWJune 2028
- Drennan Energy StorageColoradoPermitted100 MWMarch 2028
- Four Mile Mesa Solar, LLCNew MexicoUnder construction100 MWJuly 2027
- Grand Basin Energy StorageMichiganAnnounced100 MWMarch 2027
- Grand Valley Solar Generation and BESSColoradoPermitted100 MWOctober 2029
- Holstein 2 Battery StorageTexasAnnounced100 MWMay 2029
- Imperial Sun SolarCaliforniaPermitted100 MWJuly 2027
- Kitt SolarArizonaTesting100 MWDecember 2026
- Northern Divide Energy StorageNorth DakotaTesting100 MWDecember 2026
- Oso NegroNew MexicoUnder construction100 MWMay 2028
- Pamela Heights I Energy CenterTexasUnder construction100 MWJanuary 2027
- Powerline Energy StorageFloridaUnder construction100 MWMarch 2027
- Raven StorageTexasTesting100 MWNovember 2026
- Sacramento Valley Energy Center, LLCCaliforniaUnder construction100 MWDecember 2029
- SE Athos II, LLCCaliforniaUnder construction100 MWJanuary 2027
- Skylight Renewable EnergyCaliforniaAnnounced100 MWJune 2028
- Southern Bighorn Solar 2NevadaPermitted100 MWJuly 2028
- Star Light Energy CenterNew MexicoUnder construction100 MWDecember 2026
- Stoneridge Solar, LLCTexasTesting100 MWDecember 2026
- Third Coast BESS, LLCTexasUnder construction100 MWNovember 2027
- Voyager Energy StorageMichiganTesting100 MWJanuary 2027
- Weld Energy StorageColoradoTesting100 MWDecember 2026
- White Tank Energy StorageArizonaUnder construction100 MWMarch 2027
- Yaupon Solar Project (Hybrid)TexasAnnounced100 MWDecember 2027
- EdgewaterWisconsinUnder construction99 MWApril 2027
- Noosa Energy Storage LLCCaliforniaUnder construction99 MWSeptember 2026
- Cannibal Draw Solar and StorageTexasUnder construction99 MWApril 2028
- Rosamond South IICaliforniaTesting92 MWNovember 2026
- Centennial FlatsArizonaUnder construction89 MWSeptember 2026
- Winchester Solar I, LLCArizonaTesting88 MWMarch 2027
- Winchester Solar II, LLCArizonaTesting88 MWMay 2027
- KeamukuHawaiiPermitted86 MWMay 2030
- Stellar Wright BESSCaliforniaTesting85 MWOctober 2026
- RedSun PV and BESSTexasPermitted84 MWJuly 2028
- Lupinus Solar 1, LLCTexasAnnounced83 MWSeptember 2027
- Big Star Solar, LLC (Hybrid)TexasTesting80 MWOctober 2026
- Foxtail Flats Solar, LLCNew MexicoUnder construction80 MWMay 2027
- North Star Energy Storage, LLCMinnesotaUnder construction80 MWApril 2027
- NISA Electric Generation ProjectNew YorkUnder construction80 MWOctober 2028
- KCE NY 29, LLCNew YorkAnnounced79 MWMarch 2030
- Cairos Solar and StorageTexasAnnounced77 MWJune 2027
- Honeycomb Solar and StorageTexasTesting77 MWNovember 2026
- Cabokenze Energy StorageGeorgiaAnnounced76 MWNovember 2027
- Myers Solar and StorageTexasPermitted76 MWAugust 2028
- Bodkin BESSTexasUnder construction75 MWDecember 2028
- Boot Hill Energy StorageKansasUnder construction75 MWDecember 2028
- Key Energy StorageCaliforniaUnder construction75 MWDecember 2026
- Noria Hondo Solar (Hybrid)TexasPermitted75 MWDecember 2027
- Zeta Solar & StorageCaliforniaUnder construction75 MWJune 2027
- Big Fork SolarSouth CarolinaUnder construction75 MWMarch 2027
- Kingsley Solar FarmCaliforniaAnnounced74 MWDecember 2028
- Briggs Solar, LLCTexasPermitted71 MWDecember 2027
- EDPR Scarlet IIICaliforniaTesting70 MWDecember 2026
- Elevate Pier SCaliforniaPermitted70 MWDecember 2026
- JVR Energy Park LLCCaliforniaPermitted70 MWMarch 2027
- Windy Lane Energy CenterNew MexicoUnder construction68 MWDecember 2026
- Wheatridge Optimization IOregonUnder construction65 MWDecember 2027
- JasmineCaliforniaTesting64 MWDecember 2027
- Bird Dog Energy StorageTexasTesting60 MWDecember 2026
- Wheatridge Optimization IIOregonUnder construction60 MWDecember 2027
- Iron BESSCaliforniaUnder construction60 MWApril 2027
- Vaca BESSCaliforniaPermitted60 MWJuly 2027
- Parowan SolarUtahAnnounced58 MWFebruary 2028
- HammondGeorgiaTesting58 MWSeptember 2026
- New Hill 1 BatteryNorth CarolinaUnder construction56 MWSeptember 2027
- Eagle Springs HybridTexasTesting55 MWDecember 2026
- Sienna 2 Solar and Storage ProjectCaliforniaAnnounced55 MWMarch 2029
- Enterprise BESSCaliforniaUnder construction54 MWDecember 2027
- Gonzaga Ridge Battery FacilityCaliforniaTesting52 MWSeptember 2026
- Lupinus Storage 3TexasUnder construction51 MWJune 2027
- Albatross Solar, LLCTexasAnnounced50 MWDecember 2027
- MRG Goody Solar Project HybridTexasTesting50 MWSeptember 2026
- Findley PV and BESSTexasPermitted50 MWJanuary 2028
- Aurora Renewable Energy (Hybrid)CaliforniaAnnounced50 MWApril 2028
- Baldy Mesa StorageCaliforniaTesting50 MWSeptember 2026
- Beartooth Energy Storage LLCMontanaPermitted50 MWDecember 2027
- Dulles Solar and StorageVirginiaTesting50 MWSeptember 2026
- Elm Flats SolarTexasUnder construction50 MWSeptember 2026
- FRP Miller SolarFloridaUnder construction50 MWDecember 2026
- KCE NY 30, LLCNew YorkAnnounced50 MWDecember 2030
- KCE NY 31, LLCNew YorkAnnounced50 MWMay 2031
- Kifer BESS 1CaliforniaUnder construction50 MWNovember 2026
- Lorenzo Energy StorageTexasAnnounced50 MWNovember 2027
- Maiden Creek BatteryNorth CarolinaUnder construction50 MWJuly 2027
- Pueblo Airport Generating StationColoradoPermitted50 MWDecember 2027
- Richwood Solar and StorageOhioAnnounced50 MWDecember 2028
- Ridgely Energy FarmTennesseeAnnounced50 MWDecember 2029
- Ryan StorageTexasUnder construction50 MWFebruary 2027
- Steele Flats Energy StorageNebraskaTesting50 MWDecember 2026
- Sundance (CO)ColoradoUnder construction50 MWSeptember 2026
- TREX US Red HollyTexasPermitted50 MWDecember 2027
- Two Oaks Solar and Storage LLCVirginiaAnnounced50 MWNovember 2027
- Wildcat Solar Power Plant LLCNew MexicoAnnounced50 MWDecember 2028
- Fortress 1ColoradoPermitted50 MWMarch 2028
- Rosamond South IICaliforniaTesting48 MWNovember 2026
- KCE CT 1, LLCConnecticutAnnounced45 MWApril 2031
- Dynegy Oakland Power PlantCaliforniaAnnounced43 MWMay 2028
- Shutler Energy StorageOregonUnder construction41 MWMarch 2028
- EDPR CA Solar Park VI LLC (CA) HybridCaliforniaTesting40 MWOctober 2026
- Sunnyside Solar Energy CenterWisconsinTesting40 MWNovember 2026
- Syracuse and Tours Renewable EnergyCaliforniaUnder construction40 MWNovember 2027
- Tracy BESSCaliforniaUnder construction40 MWMay 2027
- Key Energy StorageCaliforniaUnder construction35 MWApril 2027
- Black Walnut Solar, LLCNorth CarolinaAnnounced32 MWDecember 2028
- Panther Branch Solar, LLCNorth CarolinaAnnounced32 MWDecember 2029
- Timber Mill SolarNorth CarolinaAnnounced32 MWDecember 2028
- Sand Luis WestCaliforniaUnder construction31 MWNovember 2028
- James River Power StationMissouriUnder construction31 MWJanuary 2027
- Craggy Energy StorageNorth CarolinaTesting31 MWSeptember 2026
- AES Waiawa Phase 2 SolarHawaiiTesting30 MWSeptember 2026
- Rockmont Solar and Storage ProjectNew MexicoPermitted30 MWDecember 2027
- Second Division SolarTexasPermitted30 MWDecember 2031
- Robeson Solar INorth CarolinaAnnounced28 MWDecember 2028
- Arlington Battery Energy Storage SystemWashingtonUnder construction25 MWSeptember 2026
- ChalanCaliforniaTesting25 MWDecember 2026
- Glenarm BESS PlantCaliforniaPermitted25 MWJune 2027
- Solar Star 3CaliforniaTesting23 MWNovember 2026
- Solar Star 4CaliforniaTesting23 MWNovember 2026
- Gaskell West Storage 1, LLCCaliforniaTesting22 MWSeptember 2026
- PF Onsite BESSPennsylvaniaPermitted21 MWJune 2027
- Bethlehem Energy Center, LLC - (VA)VirginiaUnder construction20 MWOctober 2026
- Elm City BESSNorth CarolinaTesting20 MWSeptember 2026
- Evergreen Energy Center, LLCVirginiaTesting20 MWSeptember 2026
- Honey Creek SolarIndianaAnnounced20 MWDecember 2027
- KCE NY 10, LLCNew YorkAnnounced20 MWOctober 2028
- Pace Road Battery StorageFloridaUnder construction20 MWOctober 2027
- Pure Hedge LLCConnecticutUnder construction20 MWOctober 2027
- Railroad Energy Center, LLCVirginiaUnder construction20 MWOctober 2026
- Reid Energy Center, LLCVirginiaUnder construction20 MWDecember 2026
- South Ripley SolarNew YorkPermitted20 MWDecember 2027
- Vonore Battery Energy Storage SystemTennesseeUnder construction20 MWDecember 2026
- Powells Creek Solar - HybridVirginiaAnnounced18 MWJune 2027
- Asheville BESSNorth CarolinaUnder construction17 MWSeptember 2026
- Essex VT BESS 1VermontUnder construction16 MWDecember 2026
- Elevate Arthur KillNew YorkTesting15 MWSeptember 2026
- Clark Creek Solar PlantNorth CarolinaPermitted14 MWFebruary 2028
- Milltown Onsite BESSNew JerseyTesting13 MWOctober 2026
- Gibson Solar Project - HybridCaliforniaUnder construction13 MWDecember 2027
- ENGIE Solidago Solar Project - HybridDelawareAnnounced13 MWJune 2027
- Salt City Solar Project - HybridOhioAnnounced13 MWJune 2027
- Sunnybrook Solar Project - HybridVirginiaAnnounced13 MWJune 2027
- KRS I Anahola Solar HybridHawaiiAnnounced12 MWJuly 2027
- KRS II Koloa SolarHawaiiAnnounced12 MWJuly 2027
- Parkwood BESSNorth CarolinaTesting12 MWDecember 2026
- Danville VA BESS 2VirginiaUnder construction11 MWOctober 2026
- Warsaw 2 Energy StorageNorth CarolinaTesting11 MWSeptember 2026
- Colorado Clean Energy Center (BESS)TexasTesting10 MWDecember 2026
- Columbus Clean Energy Center (BESS)TexasTesting10 MWNovember 2026
- Matagorda Clean Energy Center (BESS)TexasTesting10 MWDecember 2026
- Mesquite Clean Energy Center (BESS)TexasTesting10 MWSeptember 2026
- Cedar Hill ESSTexasPermitted10 MWJune 2030
- Grizzly Ridge SolarTexasTesting10 MWSeptember 2026
- Harlingen #1 BESS 1TexasTesting10 MWNovember 2026
- Knapp BESSTexasTesting10 MWOctober 2026
- North Edinburg BESS 1TexasTesting10 MWNovember 2026
- Orchard BESSTexasTesting10 MWNovember 2026
- Sherco LDESMinnesotaUnder construction10 MWMay 2028
- South Portland ESS, LLCMaineUnder construction10 MWDecember 2027
- Apple BESSTexasTesting10 MWSeptember 2026
- BESS TX Camarine - BSHOU001TexasUnder construction10 MWNovember 2026
- HockleyTexasTesting10 MWFebruary 2027
- Regis LeakeyTexasTesting10 MWDecember 2026
- Regis MedinaTexasTesting10 MWDecember 2026
- Torrecillas Energy StorageTexasTesting10 MWDecember 2026
- Industrial Parkway StorageCaliforniaTesting10 MWSeptember 2026
- East BernardTexasTesting10 MWNovember 2026
- PledgerTexasTesting10 MWNovember 2026
- Sherwood Forest BESSLouisianaAnnounced8 MWJuly 2027
- Hamakua Energy PlantHawaiiAnnounced8 MWNovember 2030
- AES Mountain View SolarHawaiiTesting7 MWNovember 2026
- Puuloa SolarHawaiiAnnounced6 MWNovember 2027
- Town of Sharon Portfolio -Mt St LandfillMassachusettsTesting6 MWJanuary 2027
- Bear Valley Battery PlantCaliforniaAnnounced5 MWApril 2027
- Bensonhurst Energy Storage 1 LLCNew YorkUnder construction5 MWSeptember 2026
- Borrego - Highland AveMassachusettsUnder construction5 MWNovember 2026
- Braley Hill North SolarMassachusettsPermitted5 MWMarch 2027
- Chicopee BESSMassachusettsUnder construction5 MWOctober 2026
- Framingham BESSMassachusettsUnder construction5 MWOctober 2026
- Holyoke MA BESS 1MassachusettsUnder construction5 MWSeptember 2026
- Ipswich MA BESS 1MassachusettsUnder construction5 MWOctober 2026
- Madena 4CaliforniaPermitted5 MWApril 2027
- Randall Lane SolarMassachusettsPermitted5 MWMarch 2027
- Sanford ESS, LLCMaineUnder construction5 MWDecember 2027
- SV CSG BloomingtonIllinoisUnder construction5 MWAugust 2027
- SV CSG MantenoIllinoisUnder construction5 MWAugust 2027
- Blue Aster B Clean Energy LLCNew YorkUnder construction5 MWAugust 2027
- Blue Aster C Clean Energy LLCNew YorkUnder construction5 MWAugust 2027
- Blue Aster Clean Energy LLCNew YorkUnder construction5 MWAugust 2027
- Heron Clean Energy, LLCNew YorkUnder construction5 MWDecember 2026
- Jamaica Community Energy, LLCNew YorkUnder construction5 MWJanuary 2027
- Lobelia 4452 Clean Energy LLCNew YorkUnder construction5 MWJuly 2027
- Lobelia Clean Energy LLCNew YorkUnder construction5 MWJuly 2027
- Wintergreen B Clean Energy LLCNew YorkUnder construction5 MWJuly 2027
- Wintergreen C Clean Energy LLCNew YorkUnder construction5 MWJuly 2027
- Wintergreen Clean Energy, LLCNew YorkUnder construction5 MWJuly 2027
- Wintergreen D Clean Energy LLCNew YorkUnder construction5 MWJuly 2027
- Longtown Energy StorageSouth CarolinaTesting5 MWSeptember 2026
- Eastern BlueBird Clean Energy LLCNew YorkUnder construction4 MWJune 2027
- Northern Cardinal Clean Energy, LLCNew YorkUnder construction4 MWJune 2027
- Riverhead - CVENew YorkUnder construction4 MWSeptember 2026
- Snipatuit Road SolarMassachusettsPermitted4 MWMarch 2027
- Madena 3CaliforniaTesting4 MWJanuary 2027
- MCCo BESS Generating FacilityOhioTesting4 MWOctober 2026
- MCCo BESS Generating FacilityOhioTesting4 MWOctober 2026
- MCCo BESS Generating FacilityOhioTesting4 MWOctober 2026
- MCCo BESS Generating FacilityOhioTesting4 MWOctober 2026
- Tanglewood BESSNorth CarolinaTesting4 MWDecember 2026
- Water Willow A Clean Energy LLCNew YorkUnder construction4 MWApril 2027
- Water Willow B Clean Energy LLCNew YorkUnder construction4 MWApril 2027
- Windsor BESSNorth CarolinaTesting4 MWDecember 2026
- Coral Honeysuckle Clean Energy LLCNew YorkTesting4 MWMarch 2027
- Linden Clean Energy, LLCNew YorkTesting4 MWMarch 2027
- Roseate Tern Clean Energy LLCNew YorkUnder construction3 MWAugust 2027
- Cushman Road SolarMassachusettsPermitted3 MWMay 2027
- EnerSmart Mesa Heights Sub StationCaliforniaUnder construction3 MWDecember 2026
- Gardenia 1CaliforniaAnnounced3 MWJune 2027
- Merced BESSCaliforniaTesting3 MWSeptember 2026
- Nebo Energy StorageNorth CarolinaUnder construction3 MWOctober 2026
- NL NY- PulaskiNew YorkTesting3 MWSeptember 2026
- Redlands DC 9 - sline609CaliforniaUnder construction2 MWNovember 2026
- Piping Plover Clean Energy, LLCNew YorkUnder construction2 MWApril 2027
- Warbler Clean Energy LLCNew YorkUnder construction2 MWApril 2027
- CA Riverside 2356 Fleetwood Dr.CaliforniaTesting2 MWNovember 2026
- MA Acushnet 540R Main StMassachusettsPermitted2 MWMarch 2027
- Merced 2 BESSCaliforniaTesting2 MWSeptember 2026
- OIT BESSOregonUnder construction2 MWDecember 2027
- Six Flags Magic MountainCaliforniaTesting2 MWSeptember 2026
- Solar Carver 1 HybridMassachusettsTesting2 MWOctober 2026
- CA Bloomington 2551 S Lilac Avenue MicroCaliforniaTesting2 MWNovember 2026
- Jade Solar 3CaliforniaAnnounced2 MWJune 2027
- Cambridge CT HybridMinnesotaUnder construction1 MWDecember 2027
- East Road Storage ProjectCaliforniaUnder construction1 MWJune 2027
- Featherbed Lane South SolarMassachusettsPermitted1 MWMarch 2027
- Solar Carver 3 HybridMassachusettsTesting1 MWOctober 2026
- Manorville IINew YorkPermitted1 MWDecember 2027
- Bishop Ranch - BR 3-FFCaliforniaTesting1 MWJuly 2027
- Bishop Ranch - BR 3-GGCaliforniaTesting1 MWJuly 2027
- Bishop Ranch - BR 3-HHCaliforniaTesting1 MWJuly 2027
- Las Virgenes MWD - Composting PlantCaliforniaTesting1 MWOctober 2026
- Romeoville 34 - SLCHI234 - BSCHI234IllinoisUnder construction1 MWMay 2027
- Sanger USD - Sanger West HSCaliforniaTesting1 MWOctober 2026
- Bakersfield DriverCaliforniaTesting0 MWSeptember 2026
- Palmdale Water District 6MG TankCaliforniaTesting0 MWNovember 2026
- Pivot Energy PPA 29 LLCCaliforniaTesting0 MWNovember 2026