Natural gas accounted for 71% of generation in Louisiana over the 12 months to July 2026.

Where they are

The 30 largest announced projects in Louisiana, by capacity.

Natural gas71%Nuclear17%Coal5%Other4%Solar3%Other (<2.5% each)1%
Generation ledger by fuel
FuelGWhShareYoY
Natural gas75,71470.5%↓ 2.8
Nuclear18,13216.9%↑ 1.9
Coal5,3155.0%↑ 0.4
Other4,2474.0%↑ 0.1
Solar3,1332.9%↑ 0.4
Hydro7930.7%–

13-month trend

Natural gas
Coal
Nuclear
Solar
Hydro
Other

What’s standing

The 8 largest of 247 operating generators; 29.4 GW total capacity.

  • Waterford 3Nuclear · Entergy Louisiana LLC1.2 GW1985
  • River BendNuclear · Entergy Louisiana LLC1.0 GW1986
  • Nine Mile PointNatural gas · Entergy Louisiana LLC0.9 GW1973
  • Nine Mile PointNatural gas · Entergy Louisiana LLC0.9 GW1971
  • Magnolia PowerNatural gas · Magnolia Power Holdings LLC0.7 GW2025
  • Brame Energy CenterOther · Cleco Power LLC0.7 GW2010
  • Big Cajun 2Coal · Louisiana Generating LLC0.7 GW1981
  • Big Cajun 2Natural gas · Louisiana Generating LLC0.6 GW1982

On the drawing board

Louisiana has 29.4 GW standing. Another 250 MW is on the board by 2026: 240 MW testing, 10 MW under construction.

Built since July 2026

  • SR ArcadiaStanding5 MW2026
  • Mondu Solar LLCStanding150 MW2026
  • SR South BastropUnder construction5 MW2026
  • SR WinnsboroUnder construction5 MW2026
  • Dolet Hills SolarTesting240 MW2026

Louisiana's announced projects could add 49.3 TWh a year by 2031. Our projection includes 23.9 TWh after applying completion factors based on project status.