Support

The Atlas

Kentucky

Coal accounted for 64% of generation in Kentucky over the 12 months to July 2026.

Where they are

Every announced project in Kentucky with a recorded location; 23 sites.

Coal64%Natural gas27%Hydro5%Solar3%Other (<2.5% each)0%
Generation ledger by fuel
FuelGWhShareYoY
Coal45,97163.9%↓ 2.3
Natural gas19,46627.1%↑ 0.9
Hydro3,7265.2%↓ 0.4
Solar2,4613.4%↑ 1.8
Other3130.4%–

13-month trend

Natural gas
Coal
Solar
Hydro
Other

What’s standing

The 8 largest of 180 operating generators; 22.4 GW total capacity.

  • Trimble CountyCoal · Louisville Gas & Electric Co834 MW2011
  • East BendCoal · Duke Energy Kentucky Inc772 MW1981
  • H L SpurlockCoal · East Kentucky Power Coop, Inc592 MW1981
  • Trimble CountyCoal · Louisville Gas & Electric Co566 MW1990
  • GhentCoal · Kentucky Utilities Co557 MW1974
  • GhentCoal · Kentucky Utilities Co557 MW1981
  • GhentCoal · Kentucky Utilities Co556 MW1977
  • GhentCoal · Kentucky Utilities Co556 MW1984

On the drawing board

Kentucky has 22.4 GW standing. Another 73 MW is on the board by 2026: 73 MW testing.

  • Heidelberg Hydroelectric ProjectTesting1 MW2026
  • Heidelberg Hydroelectric ProjectTesting1 MW2026
  • Heidelberg Hydroelectric ProjectTesting1 MW2026
  • Heidelberg Hydroelectric ProjectTesting0 MW2026
  • Heidelberg Hydroelectric ProjectTesting0 MW2026
  • Heidelberg Hydroelectric ProjectTesting1 MW2026
  • Blue MoonTesting70 MW2026

Kentucky's announced projects could add 8.3 TWh a year by 2031. Our projection includes 6.9 TWh after applying completion factors based on project status.

Kentucky in the news

Loading news…

→ all Kentucky clippings

← See Kentucky on the map